News

Advertising Barrier Installation Notes

Dec 14, 2016 Leave a message

1. advertising barrier before installation, please be sure to carefully check parts list, advertising barrier than road, Zha, it has more parts: flap, rods, light bar and ensure that the full.

2. determination of barrier installed around the issue, as shown depending on the installation site, so customers need to provide detailed site information.

3. determine the surface smoothness of installation, if installation of slopes, are pouring concrete foundations, ensure that the flat surface of the chassis.

4. ensure that the installation of ground Induction coil.

5. ensure that after installation of debugging, debug LED lights, advertising barrier to normal operation.


Send Inquiry